Electrical engineers are installing electricity cables on a building site. Points \((x,y,z)\) are defined relative to a main switching site at \((0,0,0)\), where units are metres. Cables are laid in straight lines and the widths of cables can be neglected.
An existing cable \(C\) starts at the main switching site and goes in the direction \(\left( \begin{matrix}3 \\1 \\-2 \end{matrix} \right)\). A new cable is installed which passes through points \(P\,(1,2-1)\) and \(Q\,(5,7,a)\).
To ensure that the cables do not meet, the engineers use \(a=-3\). The engineers wish to connect each of the points \(P\) and \(Q\) to a point \(R\) on \(C\).