2026 CCHY P2 Q12

2026 CCHY P2 Q12

Secondary 4
8 marks

A mathematics teacher designed an assessment consisting of \(x\) questions. The average time taken (\(y\) mins) by students is related to the number of questions by \(ae^{2y}=e^{bx^2+4}\), where \(a\) and \(b\) are constants. The table below shows the relationship between \(x\) and \(y\).

\(x\)\(1\)\(2\)\(3\)\(4\)\(5\)
\(y\)\(1.5\)\(3\)\(5.5\)\(9\)\(13.5\)
  1. On the grid below, plot \(2y\) against \(x^2\) and draw a straight-line graph.[2]
  1. Use your graph to estimate the value of \(a\) and of \(b\).[3]
  2. Use your graph to estimate the value of \(x\) when \(e^y=850\).[2]
  3. A student claims that there is a value of \(x\) when \(e^y=0.5\). Explain why the student's claim is impossible.[1]

Solution:

Solution locked

Sign in to view the step-by-step solution

Similar questions are unavailable for this question.
Answer:(a) \(2y=x^2+2\). (b) \(a\approx7.39,b=1\). (c) \(x\approx3.39\). (d) It would require negative time.

Need help? Join our JC Math tuition classes.

Learn more