A construction company, which has just won a contract to build foundations at two different sites I and II, wants to buy a new borewell drilling machine. Two brands, MTZ and STK, are considered and tested. To test a machine, it is used to drill a hole for ten hours.
The following date were recorded.
MTZ: The depth drilled is \(4.5\)m in the first hour, and for each subsequent hour, the depth drilled decreases by a positive constant \(r%\).
STK: The depth drilled is \(4.7\)m in the first hour, and for each subsequent hour, the depth drilled decreases by \(0.1\)m.
It is given that the machines perform the same way as recorded at the test site.
Before drilling starts at Site II, the engine of MTZ borewell drilling machine breaks down.
Video solution locked
A free account saves your progress; this video needs tuition enrolment.
680+ questions here come with free worked solutions. A free account saves your questions and progress; this one needs tuition enrolment.
Create a free account to practise similar questions.
Need help? Join our JC Math tuition classes.
Learn more